Municipal Projects:

Street/Sidewalks:

New Florence Curb Project, New Florence, MO

Engineering and design for curbs on existing streets for the City of New Florence. Completed 2000

Montgomery City Pedestrian Trail & Lighting Projects, Montgomery City, MO

Surveying, design, bid specifications, and construction inspection for 4200 LF of pedestrian trail and 15 lights for the City of Montgomery City. Partly funded by a MODOT Enhancement Grant.

Completed 2011

Construction Cost: $75,000

Highway J Pedestrian Walkway, Wright City, MO

735 LF of 4 feet wide, 7 thick concrete walkway, 2545 LF of 4 feet wide 4 thick concrete walkway. All necessary storm water drainage and piping design, grading leveling, seeding and mulch.

Construction Cost: $65,964

Funded in part by MODOT Enhancement Grant

Hwy “D” Sidewalk Project, Marthasville, MO

Design and specifications for 1100 LF of sidewalk for the City of Marthasville. Funded by ARRA grants through MODOT Enhancement Grant.

Completed in 2010

Construction cost: $40,700

Old Hwy “40” Sidewalk Project, Jonesburg, MO

Design and specifications for 950 LF of sidewalk for the City of Jonesburg. Funded by ARRA grants through MODOT Enhancement Grant.

Completed: 2010

Construction cost: $44,300

Ozark Street, Marthasville, MO

Engineering design and specifications for 600 LF of concrete street with concrete curb and gutter and storm water drainage.

Completed: 2003

Construction Cost: $60,000

Griswold Avenue, Marthasville, MO

Phase 1:

Engineering design and specifications for 480 LF of concrete street with concrete curb and gutter and storm water drainage

Completed: 2007

Phase 2:

Engineering design and specifications for 270 LF of concrete street with concrete curb and gutter and storm water drainage.

Currently under construction.

South Street, Marthasville, MO

Engineering design and specifications for 460 LF of concrete street with concrete curb and gutter and storm water drainage.

Completed: 2009

Construction Cost: $113,000

AFB Lift Station & Mitchell Road Project, Montgomery City, MO

Mitchell Road Project (Phase 2):

Surveying, engineering design, bid specifications, and construction inspection for asphalt street overlay project for the City of Montgomery City.

Completed in 2011

Market Street Improvement Project, Warrenton, MO

Engineering design and specifications for 900 LF of concrete street with concrete curb and gutter, 1150 LF of concrete pedestrian sidewalk, storm water drainage, and existing utility relocation.

Completed: 2007

Construction Cost: $388,000

Funded in part by CDBG

Ash Road, Warrenton, MO

2700 LF of asphalt street with concrete curb and gutter.

Completed: 2002

Construction Cost: $188,000

Funded by Neighborhood Improvement District

Market Street Pedestrian Sidewalk Project, Warrenton, MO

Engineering design and specifications for 1900 LF of concrete pedestrian sidewalk and 210 LF of poured-in-place concrete retaining wall.

Currently in Design/Funding Phase

Funded in part by CDBG

Highway J Pedestrian Walkway, Wright City, MO

735 LF of 4 feet wide, 7 thick concrete walkway, 2545 LF of 4 feet wide 4 thick concrete walkway. All necessary storm water drainage and piping design, grading leveling, seeding and mulch.

Construction Cost: $65,964

Funded in part by MODOT Enhancement Grant

Waterline/Sanitary Sewer:

Stella Road, Montgomery City, MO

Professional engineering and surveying for 555 LF of 6 sanitary & 1087 LF of 8 waterline.

Completed: 2006

Village of McKittrick, Montgomery County, MO

Preliminary engineering and surveying for a centralized sanitary sewer system for the Village of McKittrick. Currently in the funding acquisition phase.

AFB Lift Station & Mitchell Road Project, Montgomery City, MO

AFB Lift Station (Phase I):

Surveying, engineering design, bid specifications, and construction inspection for a lift station for the City of Montgomery City to serve the proposed AFB International facility.

Completed in 2009

Dutzow Centralized Wastewater System, Warren County, MO

Surveying, engineering design, bid specifications, and construction inspection for an Activated sludge 18,000 GPD wastewater treatment facility including 1900 LF of pressurized sewer collection system with two MODOT highway bores for Warren County.

Currently in the Construction Phase.

Approximate Project Cost: $354,000. Funded in part by CDBG grants.

Pendleton Centralized Wastewater System, Village of Pendleton, Warren County, MO

Surveying, engineering design, bid specifications, and construction inspection for a 14,990 GPD recirculating sand filter wastewater treatment facility with 4000 LF of gravity sewer and one MODOT highway bore to serve the Village of Pendleton. Currently in the Construction Phase.

Approximate Project Cost: $410,000.

Funded in part by DNR ARRA and CDBG grants.

Montgomery County Water District #1

Engineering, Design & Inspection of 250,000 Gallon water tank & 1370 deep well.

Completed: 2006

Construction Cost: $600,000

Montgomery County Water District #1 – Pendleton, Warren County, MO

Surveying, engineering design for 8,900 LF of water main extension including 1 railroad bore & four MODOT highway bores.

Project is currently in the construction phase.

Southern Wright City Waterline Projects (Phases 1 - 4), Wright City, MO

Surveying, engineering design, and bid specifications for replacement of +/-13,200 LF of 6”, 8”, and 10” water main for the City of Wright City.

Phase 4 currently under construction.

Approximate Construction Cost: $680,000+/-.

Sanitary Sewer Collection and Treatment - Lincoln County PWSD#2, MO

Preliminary Engineering for grant application and planning for sanitary sewer collection and treatment for the district. Currently in the grant application phase.

Truesdale Waterline Improvement, Truesdale, MO

Phase 1:

6516 LF of 6 PVC waterline, 1489 LF 8 PVC waterline, 260 LF DIP pipe, plus 300 LF of 16 boring with casing, valves, hydrants, meters, fittings and connections, street replacement, grading seed and mulch.

Completed: 2001

Construction Cost: $339,394

Funded in part by CDBG

Phase 2:

2438 LF 6 PVC plus casing valves, hydrants, fittings and connections, street replacement, grading seed and mulch.

Completed: 2002

Construction Cost: $134,120

Funded in part by CDBG

Truesdale Packaging Well #1, Truesdale, MO

Engineering Design for well, well house and water distribution lines.

Completed: 2006

Truesdale Packaging Well #3, Truesdale, MO

Engineering design for well, well house and water distribution lines.

Completed: 2002

Construction Cost: $180,000

Clara Street Waterline Project, Warrenton, MO

1,766 LF of 8 water main and 21 LF of 6 water main.

Currently in Construction

Northwoods Sewer Project, Warrenton, MO

1600 LF of 8 gravity sanitary sewer extension.

Completed: 2004

Construction Cost: $61,000

Turning Point, Warrenton, MO

Recirculating sand filter 3,050 GPD wastewater treatment facility.

Completed: 2004

Construction Cost $51,500

Funded in part by CDBG

South Spoede Lift Station, Warrenton, MO

1217 LF 8 gravity sewer, 1587 LF 8 force main; lift station with generator; two 27 HP, 540 gpm ABS pumps; and a controlled discharge holding tank.

Completed: 2006

Construction Cost: $339,000

Highway J Sewer Extension, Wright City, MO

3018 LF 8 PVC gravity sewer line, 2289 LF 2 ½ PVC force main, duplex lift station with two (2) grinder pumps.

Completed:

Construction Cost: $116,465

Funded in part by CDBG

Schools:

Bellflower/Jonesburg Elementary School

Engineering design and specifications for storm water drainage.

Completed: 2002

Construction Cost: $39,000

Gasconade R-I School District, Hermann, MO

Professional surveying services for construction stakeout of the high school track and football field.

Completed 2005

Montgomery County R II School District

Phase 1:

High School Driveway: 4600 sq. yds. concrete street with curb and gutter,

4000 sq. ft. concrete walkway, 1,200 LF storm drain.

Completed: 2002

Construction Cost: $256,000

Phase 2:

Middle School Driveway: 3100 sq. yds. concrete street with curb and gutter,

1,000 LF storm drain.

Completed: 2004

Construction Cost: $179,000

High School Waterline Extension:

2,913 LF 8 waterline & 2,720 LF 6 waterline.

Completed: 2001

Warren County R-III School District

High School and Middle School Drainage Project

1200 LF of storm drain, 600 LF of roof drain, grading and pavement repair

Completed: 2007

Construction Cost: $105,000

Athletic Complexes:

Warrenton Athletic Complex, Warrenton, MO

Surveying, engineering design, bid specifications, and construction inspection for a grading project for four softball fields and five soccer fields for the City of Warrenton.

Construction Cost: $149,000.

Rhineland Park, Village of Rhineland, MO

Site layout, design, and surveying for an athletic complex for the Village of Rhineland.

Completed 2001

Mapping:

City of Montgomery Zoning and Parcel Map

Creation of CAD base map for zoning and parcel data for the City of Montgomery City.

City of Truesdale Annexation Map

Creation of CAD base map for annexation data for the City of Truesdale, MO.